Monday, July 16, 2018

Mailhelp@pcmfluidpower.co.uk                                                   Phone pic +44 (0)1327 842808

DIRECTIONS TO PCM FLUID POWER LTD - NN6 7PP

LOW BRIDGE

Please note:   If you are coming to us via Long Buckby village there is a low bridge just before our offices.  Maximum height is 11'.6".  For high vehicles you will need to get into our offices via the A5.

 

TRAVELLING FROM THE SOUTH

Follow M1 to A45 in Northamptonshire.  Take exit 16 from M1.  At the top of the slip road take 1st exit on the roundabout and follow A45
 through Flore and down to Weedon.  At the crossroads in Weedon turn right and follow A5 towards Hinckley/Nuneaton for approx. 3.8mi.  Turn right towards Long Buckby Wharf / Long Buckby Village.  Follow the lane down (Three Bridges Road) and over the canal bridge. You will see a railway bridge and motorway bridge in front of you, turn left before the bridges  into Wharf Works.  We are the first building on the right as you come down the ramp.

 

TRAVELLING FROM THE NORTH

Follow M1 to Northamptonshire.  At junction 18 on M1 take the A428 exit to Daventry/A361.  At the roundabout take the 3rd exit onto A5.  At the roundabout take the 1st exit onto A428.  At the next roundabout take the 2nd exit and stay on A428.  At the roundabout take the 1st exit onto A5.  At the roundabout take the 1st exit and stay on A5 for 4.7mi.  Once you go past the pub on your right hand side by canal, the New Inn, take the next turn on the left B4026.  Follow the road (Three Bridges Road) over the canal bridge.  You will see a railway bridge and motorway bridge in front of you, turn left before the bridges into Wharf Works.  We are the first building on the right as you come down the ramp.

 

TRAVELLING FROM THE A14

Follow A14 towards Welford.  At junction 1, take the A5199 exit to Welford. Turn right on to the A5199.  Take the first turning on the right to Cold Ashby.  Continue through Cold Ashby village on Cold Ashby Road/Main Street.  Follow the road out of the village towards West Haddon.  At the roundabout take the 2nd exit onto Guilsborough Road. Go through one roundabout.  At the next roundabout continue straight on to High Street.  At the roundabout take the 1st exit onto Station Road.  Following the road, continue  on to Watford village.  Follow through the village up to the A5.  At the A5 turn left.  Follow the A5 for 1.8mi.  Take the exit on the left to Long Buckby Wharf/Long Buckby Village - B4036 (Three Bridges Road).  Following the road you will come to a railway bridge and motorway bridge.  Turn left before the bridges into Wharf Works.  We are the first building on the right as you come down the ramp.

 

 

 


















PCM Footer